Construction of initial part of
East Wing Breakwater with a total length 800m & an adjacent Dyke with
length of 250m.
It also consists of following
works:
- Completion the protection layer
of West Wing Breakwater
- Demolishing of old East Wing
Breakwater (125m length)
- Construction of 3 Commodity
loading Jetties with total length of 577m and the associated wall with a length
of 58m
- Construction of 2 Oil Jetties
with a length of 180m each
- A 12 hectare soil improvement in
reclamation area with dynamic compact method.